This Dam Wall was originally made of Glass BlocksThe wall failed. It cracked and leaked and was unsafe. |
|
The Glass Block was removed and a steel rienforced concrete wall was built in it's place. |
![]() |
The outside of the wall is being tiled. |
![]() |
The inside wall is being prepared for tiles. |
![]() |
![]() |
The inside walls and top have been tiled. |
![]() |
![]() |
Work and clean-up is done. The pool is filling |